Installation Video Series, Part 8: Repairing Lap Siding Butt Joints
Siding repair contractors can use the following as guidance when repairing butt joints that were not spaced correctly and may be causing LP® SmartSide® Lap Siding to buckle. When installed, all ends and butt joints should be spaced a minimum of 3/16″. For a quick reference, watch our expert demonstrating this repair process.
The Remedy Process
Let's begin with the remedy process. You'll start by using wooden wedges to separate the affected piece of lap from the overlapping piece above. To protect the housewrap from this next step, you may use a piece of metal sheeting to slide behind the lap siding. Using a keyhole or reciprocating saw with a fine-toothed blade, remove enough material from the end of one piece of lap siding in order to provide at least 3/16" of space.
If any area of the siding has been forced to deflect away from the wall, face-nail only that area to flatten the piece back against the wall.
Preparing the Joints for Finishing
Be sure to properly caulk and paint all exposed nail heads. Remove all loose debris, sawdust and leftover caulk from the expansion joint to smooth out the cut ends so that the surface is prepared for finishing. Using a brush, prime all exposed wood fibers in accordance with application instructions.
Be sure to follow the paint manufacturer's application and maintenance instructions. Seal the gap with an ASTM C920, Class 25 Sealant.
Finish the repaired area using an exterior paint consistent with LP SmartSide siding application instructions. Be sure to follow the paint manufacturer's application and maintenance instructions.
Homeowners, Find Siding Repair Contractors in Your Area
For more LP SmartSide siding installation tips, visit the LP SmartSide Installation Series. If you are a homeowner searching for authorized LP SmartSide siding repair contractors in your area, visit Get LP SmartSide today.
Continue Reading
Business Solutions
4 minQ&A: How Home Orientation Impacts Continuous Insulation
There's a lot to consider when it comes to building an energy-efficient home for your clients and the many nuances that change with each build—including its orientation to the sun.
Continue ReadingResiliency Solutions
5 minHOW A RADIANT BARRIER CAN IMPROVE BURIED DUCT PERFORMANCE
There are several insulation methods based on attic design, but ducts placed over the bottom of truss chords and buried under insulation in a vented attic is a popular builder option.
Sustainability Solutions
8 minHow to Drive Effective Communication and Collaboration on the Jobsite
Every jobsite has a ton of moving parts, from product shipments, supplies, and schedules to subcontractors and homeowners. It's no wonder that many project teams can struggle to maintain quality jobsite communication and collaboration throughout the building process.
Sustainability Solutions
6 minCarbon Negative, Future Positive: LP® Structural Solutions Portfolio Releases Environmental Product Declarations
In an era where environmental responsibility is paramount, we are proud to announce a remarkable achievement: the LP® Structural Solutions portfolio has been officially designated as carbon negative. This milestone is a testament to our unwavering commitment to redefining construction materials for the better with a focus on sustainability, resiliency and groundbreaking advancements.